INTRODUCTION
HAPPY ONE CENTRAL

Happy One Central is located in a prime location in the center of Thu Dau Mot City. This is a high-quality apartment project and was honored by the Property Guru Asia Real Estate Awards as “The best apartment in Binh Duong”. Happy One Central continues to affirm its position when it was established by the Vietnam Record Association in early 2024. On July 28 2024, Happy One Central officially handed over home to residents.

In particular, after just over 30 days of officially organizing the handover activities with an average of 34 keys being handed over to customers each day, the investor has so far completed the handover of more than 1,000 apartments. At the same time, announcements and instructions for coordination in implementing the necessary procedures/documents to start the roadmap for granting CERTIFICATES OF LAND OWNERSHIP AND ASSETS ATTACHED TO LAND from September 5, 2024

PRICE DETAILS

(Updated continuously and latest)

ONE BEDROOM
Happy One Central

1.71 – 1.88 billions

  • ✔ Area 50m²
  • ✔ 01 bedroom
  • ✔ 01 bathroom
  • ✔ 01 closed kitchen
  • ✔ 01 laundry loggia
  • ✔ 01 balcony

TWO BEDROOMS
Happy One Central

2.39 – 2.60 billions

  • ✔ Area 70m²
  • ✔ 02 bedrooms
  • ✔ 02 bathrooms
  • ✔ 01 closed kitchen
  • ✔ 01 laundry loggia
  • ✔ 01 balcony

THREE BEDROOMS
Happy One Central

3.62 – 3.81 billions

  • ✔ Area 93m²
  • ✔ 03 bedrooms
  • ✔ 02 bathrooms
  • ✔ 01 closed kitchen
  • ✔ 01 laundry loggia
  • ✔ 01 balcony

CONTACT FOR CONSULTATION




    You are in need of:

    PROJECT OVERVIEW
    HAPPY ONE CENTRAL

    • 41
    • FLOORS
    • 3 basements, 2-storey podium
    • 2
    • FLOORS
    • Block A includes 682 apartments, Block B includes 609 apartments
    • 1291
    • FLOORS
    • Including 1-3 bedroom apartments and 13 Shophouses
    • 1 – 3
    • FLOORS
    • Area from 49m2 – 125m2

    Investor
    VAN XUAN GROUP

    Design unit
    ONG & ONG

    Construction unit
    CENTRAL

    🔷 Project HAPPY ONE CENTRAL
    🔷 Location 38A N8 street, Phu Hoa ward, Thu Dau Mot city, Binh Duong
    🔷 Blocks 2 blocks | Block (A), Block (B)
    🔷 Total floors 3 basements | 2 commercial podiums | 41 floors
    🔷 Utility floors 3rd floor, 20th floor, 41st floor
    🔷 Type apartment 1 – 3 bedrooms | Shophouse
    🔷 Total units 1304 units
    🔷 Opening year 2021
    🔷 Handover year Quarter 3/2024
    🔷 Handover standards Basic furniture
    🔷 Legal ownership Long-term pink book (Vietnamese) | 50-years pink book (Foreigners)
    🔷 Unit price 34.5 – 37 million VND/m²

    LOCATION
    HAPPY ONE CENTRAL

    Located in Phu Hoa ward, Happy One Central connects to major roads such as DT743, National Highway 1A, National Highway 1K, National Highway 13, My Phuoc – Tan Van Expressway. In addition, Happy One Central’s location also possesses existing external utilities:

    Located in Phu Hoa ward, the center of Thu Dau Mot City, Happy One Central easily connects to major roads such as National Highway 13 (Binh Duong Avenue), My Phuoc – Tan Van, Pham Ngoc Thach and central roads of Thu Dau Mot City such as 30/4, CMT8, Yersin…

    • 300M: Binh Duong Boulevard
    • 1KM: Go Dau Stadium, Song Be Golf
    • 2 – 4KM: Market, Supermarket, Primary School, Binh Duong University, General Hospital
    • 7 – 8KM: AEON MALL, Administrative Center, Industrial Parks (VSIP, Song Than, Dai Dang…)

    ACTUAL IMAGES
    HAPPY ONE CENTRAL

    By October 2024, the Happy One Central project has been in operation for 3 months. We invite you to take a look at the latest progress images of the project in October 2024.

    In addition, the project’s utilities have been completed. This includes community amenities such as swimming pool, gym, 3D golf, karaoke room, cinema room and multi-functional entertainment area, all designed to enhance the quality of life for residents.

    FLOOR PLAN
    HAPPY ONE CENTRAL

    Happy One Central apartment project – includes 41 floors and 3 basements including:

    • 1, 2 Floors: shophouse
    • 3, 20, 41 Floors: internal facilities
    • 4 – 19 and 21 – 39 and 40 Floors: apartments

    FACILITIES FLOOR PLAN

    APARTMENT FLOOR PLAN

    APARTMENT FLOOR PLAN
    HAPPY ONE CENTRAL

    LAYOUT 1 PN

    LAYOUT 1 PN+1

    LAYOUT 3 PN

    LAYOUT 2 PN

    INTERNAL FACILITIES
     HAPPY ONE CENTRAL

    Happy One Central is built with a system of 68 high-class utilities arranged alternately on the floors of the apartment complex with many high-class utilities appearing for the first time in Binh Duong such as:

    3rd floor: billiards, billiards, karaoke room, cinema room, working space, 3D golf, gym, yoga , library, luxury dining area, BBQ,…

    20th floor: children’s play area, observatory, billiards area…

    41st floor: cinema area, sky bridge, food court, relaxation space, “sky garden”,….

    CONSULTANT TEAM

    Linh Ngô
    Consulting Specialist

    TIỂU YẾN
    Consulting Specialist

    HẢI TRẦN
    CEO

    Vi BÙI
    Consulting Specialist

    PHẠM NGỌC
    Consulting Specialist

    CONTACT FOR CONSULTATION




      You are in need of:

      HAPPY ONE CENTRAL NEWS